Northern Airborne Technology STX100 User Manual
Page 46
STX100-000 Installation Approval Test Procedure
3.4 EMI
Testing
Perform an EMI ground test with engine(s) operating, using the criteria in section 3.2
above; with all additional equipment required by the newly installed system.
Note: All of the equipment in the table below may not be present in the aircraft.
Operate and observe the following aircraft systems for anomalies.
Note: Data observed should be reasonable and stable, and equipment operation
should be normal.
(Equipment not installed should be noted in the comments column. T=Threat, V=Victim)
System to be Verified
Pass/fail
Comments
VHF Comm. (T/V)
VHF Nav (T/V)
ILS (T/V)
NAV. Equipment (T/V)
GPS system (T/V)
Cockpit Displays (T/V)
Cockpit and Cabin Audio
Cockpit Voice Recorder (T/V)
Marker Beacon (T/V)
ADF (T/V)
Transponders (T/V)
Loud hailer (T only)
Heading Source (T/V)
Air Data System (T/V)
Automatic Pilot/Flight Director (T/V)
ELT (Do not test for threat)
Resource tracking (T only)
VHF FM (T only)
UHF FM (T only)
OTHER
OTHER
OTHER
End of Installation Approval Test Procedure
Page 4 of 4
May 24, 2002
Rev. 1.00
E NG-FORM: 634-0100.DOT
CONFIDENTIAL AND PROPRIETARY TO NORTHERN AIRBORNE TECHNOLOGY LTD.