Installation, 1 introduction, 2 unpacking and inspection – Northern Airborne Technology STX100 User Manual
Page 17: 1 warranty
SM67 Rev. 4.10
STX100-000 Globalstar
™
Satphone Transceiver Manual
Section 2 Installation
2.1
Introduction
Information in this section consists of: unpacking and inspection procedures, installation
procedures, post-installation checks, and installation drawings.
2.2
Unpacking and Inspection
Unpack the equipment carefully, and locate the warranty card. Inspect the unit visually
for damage due to shipping and report all such claims immediately to the carrier
involved. Note that each unit should have the following:
- STX100-000 Globalstar
™
Satphone Transceiver
- Warranty Card
- Release certification
Verify that all items are present before proceeding, and report any shortage immediately
to your supplier.
Note: The STX100-000 is shipped from NAT in a deactivated state. The unit must be
registered with and activated by Globalstar™ before any operation of the system
can be attempted. Please refer to the information sheet packaged with the
STX100-000 for registration details.
2.2.1
Warranty
Complete the warranty card information and send it to NAT when the installation is
complete. If you fail to complete the warranty card, the warranty will be activated on
date of shipment from NAT.
Note: An appropriately rated facility, e.g. Certified Aircraft Repair Station, must install
this equipment in accordance with applicable regulations. NAT Ltd’s warranty is
not valid unless the equipment is installed by an authorized NAT Dealer. Failure
to follow any of the installation instructions, or installation by a non-certified
individual or agency will void the warranty, and may result in a non-airworthy
installation.
CAUTION:
Any changes or modifications to this equipment not expressly
approved by Northern Airborne Technology Ltd could void the
user's authority to operate the equipment.
Sep 7, 2005
Page 2-1
ENG-FORM: 805-0106.DOT
CONFIDENTIAL AND PROPRIETARY TO NORTHERN AIRBORNE TECHNOLOGY LTD.