Nortec Air Humidification System BS User Manual
Page 20
25.05.05-A
page 20 of 30
5.3
General notes on assembly
-
Installation has to be carried out according to the general engineering rules and the connection
regulations of the local utility companies.
-
Before the installation, check whether the delivery is complete and undamaged, using the delivery
note for this purpose.
-
The tubes may only be installed by certified master craftsmen that were instructed on how to
proceed.
-
No unauthorised conversions or alterations may be carried out on the devices.
-
No additional fittings (e.g. valves, etc.) that are not included in the assembly plan may be installed
in the NORTEC system.
-
These assembly instructions only refer to individual systems. The manufacturer provides
individual system diagrams for the customers' systems.
-
Furthermore instruction measures on assembly are carried out. The assembly instructions, the
diagrams and the instruction are binding for the execution.
-
It is obligatory to comply with the material specifications.
5.3.1 Atomiser
BS5/10
Positioning of the atomisers
-
Select a distance to the ceiling of at least 0.5m (1.64 ft)
-
Do not place the atomisers directly above a workplace
Min. 0,5m (1.64 ft)
-
The air space has to be free over a distance of 3-4m
(9.84-13 ft) in an angle of 90°.
-
Avoid exposure of the atomisers to direct sunlight.
Min. 2,5 m (8.2 ft)