Nortec Air Humidification System BS User Manual
Page 14
25.05.05-A
page 14 of 30
10
20
30
40
30
15
20
25
10
5
WA
KOM
Bs10
Bs5
Trafo(1)
Trafo(2)
Trafo(3)
Trafo(4)
A
B
B’
The tube requirements for air and water supply depend on the tube run. It is determined on the basis of the
ground plan. For this example, the result is approx. 160 meters (525 ft) of the NORTEC quick-
assembly kit (SMB). The SMB includes the necessary cables, low-pressure tubes and fittings. For
further information on the tube run, please see Chapter 4.3-4.5.
The solid line stands for power supply, the dotted line for air and water supply.
WA:
Water treatment, if necessary
KOM: Compressor
String from A to B (B’)
Point of distribution
IMPORTANT: Take care not to connect more than 6 BS5/10 to one string when planning the
supply network for the atomisers (water and compressed air). Malfunctions may occur if more
than 6 devices are connected. To prevent this and if required, two further strings must be
created for splitting up the string (see sketch above).