Installing the Power Vent
Figure 4. Framing the Opening for Power Vent
Selecting A Termination Location
Before installing the termination, ensure that the proper air flow restric-
tor is installed as shown on page 5, and check to ensure the planned
termination location is acceptable. For a detailed illustration of allowed
termination locations, see
Appendix A.
Installing the External PV Termination
Step 1. Construct a frame for the termination opening to
12 1/2" x 12 1/2".
12 ‰
12 ‰
Figure 5. Assemble
the mounting frame, collar, and conduit.
Figure 6.
Fastening the conduit to the inner frame
2. Insert the conduit and wiring into the inner mounting frame on
the bottom right of the frame. Install the Collar and ensure that
the conduit can be fastened to the collar and inner mounting
frame as shown in figure 6.
3. Screw the collar in place with three screws as shown in figure 5.
Frame Assembly
Figure 9.
Installing the Frame Asssembly.
6. Install and screw the frame asssembly in place, and ensure that
the frame is level.
üüüüüü
Inner Frame Assembly
4. Install the conduit frame around the molex connector as shown in
figure 7a. Screw the collar in place using two screws.
Figure 7b.
Installing the Conduit Frame.
5. Assemble the inner frame assembly into the exterior frame and
attach the outer collar to the direct vent pipe that is protruding
through the framed opening.
Inner Frame Assembly
Outer Frame Assembly
Direct Vent Venting
Figure 8.
Assembling the inner and outer frames.
Page 5