beautypg.com

Measurement Computing DaqTemp User Manual

Page 36

background image

5-6 CE-Compliance

08-27-02

DaqTemp Series User’s Manual

Connect Cable and Grounding Pigtail to the DaqTemp Module

1. Verify that the P4 connectors of the CA-195CE Cable and the DaqTemp Module are

correctly aligned. Correct alignment is indicated when the P4 locator triangles face
each other (see figure). The triangles locate pin A1.

2. Complete the connection.

3. Connect the open end of the Grounding Pigtail to the threaded insert located to the

right of DaqTemp’s P4 connector. See following figure.

At this point your board will be CE compliant, providing that the conditions listed on your DaqTemp PCI
board’s Declaration of Conformity are satisfied. You can return power to the system and commence with
normal operation of your DaqTemp system.

DaqTemp Module

This manual is related to the following products: