Appendix – MEGA Corp. MTT-OPS-1 User Manual
Page 54
![background image](https://www.manualsdir.com/files/797340/content/doc054.png)
MTT-OPS-1
13 Nov 2013
SECTION 7
Appendix
7-3
MTT-OPS(CL)-1
13 Nov 2013
BEFORE OPERATIONS
These procedures are used to perform a walk-around
inspection of the MEGA water tanker system before
use or beginning of a shift. This inspection is in
addition to and does not replace the vehicle
manufacturer’s inspection requirements.
1. Chocks – As Required.
2. Vehicle Parking Brake – ON
3. Cab Control Switches – SET OFF
4. (If Equipped) Foam Concentrate Level –
CHECKED
(No more than 1” from the top of the tank.)
Ensure PPE fall arrest harness is worn, adjusted
properly and attached to an anchor point. Failure
to use PPE properly may result in personnel
injury or death.
5. Water Cannon – CHECKED AND SECURED
a. Nozzle – Check for security and kinking of
foam concentrate supply line.
N-2