Normal operations – MEGA Corp. MTT-OPS-1 User Manual
Page 34
MTT-OPS-1
13 Nov 2013
SECTION 4
Normal Operations
4-7
6. Cab Control SYSTEM/POWER Switch – ON
7. MONITOR/BFV Switch – ON
8. DUMP BAR Switch – ON
9. DRAIN Switch – ON
10. Water Cannon Nozzle – Pointed fully DOWN
11. Cab Control SYSTEM/POWER Switch – OFF
12. Turn engine off.
13. Hose Reel – DRAIN
a. Hose – UNWIND
b. Nozzle – Fully OPEN
c. Gate Valve – OPEN
d. Allow water to drain.
e. Hose – REWIND
f.
Gate Valve – CLOSED
g. NOZZLE – CLOSED
14. Check to ensure all water has drained from tank.
TO REACTIVATE UNIT:
1. Lubricate water pump bearings as instructed in -2
technical manual.
2. Inspect tank interior to ensure it is clean, if the
tank is coated, ensure coating integrity, clean or
repair as required.
3. Install sump cover with new gasket.
4. Close all drain valves and petcocks.
5. Start engine.
6. Control SYSTEM/POWER Switch – ON
7. Individual Spray Head Switches – OFF
8. DUMP BAR Switch – OFF
9. DRAIN Switch – OFF
10. MONITOR/BFV Switch – OFF
11. Cab Control SYSTEM/POWER Switch – OFF
12. Turn engine off.