beautypg.com

Herrmidifier Herrmidicool User Manual

Page 9

background image

Herrmidicool IOS Manual

I n s t a l l a t i o n , O p e r a t i o n & S e r v i c e M a n u a l

9

www.herrmidifier-hvac.com

SYSTEM OFF 000% 3 01
MENU 5

10. After establishing the “password”, repeat steps 3 through 5

to program Menu 3. Press “Back” to return to MAIN MENU.

(Menu 1)

11. Press “up” arrow for Menu 5. The LCD will read:

12. Repeat steps 3 and 4 to complete Menu 5. The press “Back”

to return to the MAIN MENU (Menu 1)

NOTE!

Programming of the setpoints for the unit is now complete.

IV. OPERATING INSTRUCTIONS

Start-Up Checklist

This Check List is intended to highlight critical installation

points. A poor installation frequently results in start-up

difficulties, and always results in less than ideal operation of

the humidifier.

1. Ensure all valves and valve cocks through the system

(especially at every head) are shut-off.

2. Electric power is connected to the control cabinet per

the diagram.

3. All sensors, airflow switches and external inputs are

connected to the cabinet.

4. Air compressor is primed, oiled and air supply is

connected to the cabinet. Air supply line has been

purged and blown down to remove any installation dirt.

Air supply line has been charged, leak tested and has a

minimum of 60 psi pressure to the cabinet.

5. Water supply is connected to the cabinet and has been

purged and blown down to remove installation dirt. Water

supply is charged and leak tested and has a minimum of

50 psi pressure at the cabinet.

6. Drain loop has been connected to the bottom of the

cabinet and has been plumbed to an open drain. Drain

piping is installed with a loop a minimum of 3” above

atomizing heads and all piping after the cabinet.

7. All water piping from the cabinet to the manifolds is level

and without loops or automatic float type air vents have

been installed at high points to remove trapped air.

8. Air handler is completely operational and has been

balanced.

9. All air and water lines at the ends of the manifolds have

been terminated with hose bibs.

10. Mist eliminators, if used, have been installed properly

over drain pan that is trapped.

11. If used, blowdown tanks, air vent check valve assemblies,

and balancing air regulators are installed as shown on

the installation layout drawing provided with this manual.

12. Call your local Herrmidifier representative to schedule

a trouble-free start-up.

Minimum two week notice is

required.