beautypg.com

Grip Factory Munich GF-16 User Manual

Page 38

background image

GF-16 Crane System Instruction Manual

Page: 37

44. Connect 2 standard rigging rods to the Rigging Rod Connectors and in turn to the

rigging connectors on section 6. Ensure that the locking pins are inserted fully.

45. Hand tighten the rods by turning the turnbuckles until the rods are taut, then secure

the turnbuckles with the locking nut as seen on page 9.
Attention:

The rigging system when taut as well as the crane arm, should run in a
straight line and should not bend or dip.

46. When the Rigging Rods are taut and running in a straight line, insert the locking pin

connecting the Rigging Rod Connectors into the Rigging Support Brackets on section
2 and section 4 as shown on page 10.

47. Remove the support stand or rostrum supporting the counterweight bucket section.
48. Then unlock the tilt friction.

Before operation, all locking pins, locking screws etc should be inspected to ensure
that all assembly sections are securely fastened.

Read “Balancing the crane arm” on page 44.