Grip Factory Munich GF-16 User Manual
Page 32

GF-16 Crane System Instruction Manual
Page: 31
42. When the Rigging Rods are taut and running in a straight line, insert the locking pin
connecting the Rigging Rod Connectors into the Rigging Support Brackets on section
2 and section 4 as shown on page 10.
43. Remove the support stand or rostrum supporting the counterweight bucket section.
44. Then unlock the tilt friction.
Before operation, all locking pins, locking screws etc should be inspected to ensure
that all assembly sections are securely fastened.
Read “Balancing the crane arm” on page 44.