beautypg.com

Grip Factory Munich GF-16 User Manual

Page 29

background image

GF-16 Crane System Instruction Manual

Page: 28

straight line and should not bend or dip.

42. When the Rigging Rods are taut and running in a straight line, insert the locking pin

connecting the Rigging Rod Connectors into the Rigging Support Brackets on section
2 and 4 as shown on page 10.

43. Connect the platform to the angle adjuster and secure with the removed safety pin

from the side of the angle adjuster. Ensure that the platform is level.

Tip:

The angle adjuster has an integrated leveller. By turning it, the vertical plate
on the angle adjuster can be set to a perfect right angle. Correct setting of
the angle adjuster enhances the crane’s balance.

44. Remove the support stand or rostrum supporting the counterweight bucket section.
45. Then unlock the tilt friction.

Before operation, all locking pins, locking screws etc should be inspected to ensure
that all assembly sections are securely fastened.

Read “Balancing the crane arm” on page 44.