Pre Start-Up Checklist -
check boxes as items are completed
Check tightness of all factory wiring connections
Verify control wiring wire gauge
Hand-rotate blower to verify free rotation
Verify supply voltage to the main disconnect
Verify the supply gas pressure
Verify remote controls wiring
Start-Up Blower Checklist - refer to IOM for further detail
Check line voltage
L1-L2
________________
L2-L3 ______________
L1-L3 ________________
Check blower rotation
Check for vibration.
Supply fan RPM
______________
RPM
Motor nameplate amps
______________
Amps
Actual motor amps
______________
Amps
Actual CFM delivered
______________
CFM
Optional Accessories -
refer to IOM for further detail
Optional component
Actual Setting
Typical Setting
Heating inlet air sensor
______________
60-70º F
Cooling inlet air sensor
______________
75º F
Building freeze protection
______________
5 minutes; 45º F
Dirty filter gauge
______________
varies
Solid fuel time delay
______________
varies
Start-Up Direct Gas -
refer to IOM for further detail
Check supply gas pressure ____________Maximum
__________ Minimum
__________Actual
Set optional High gas pressure switch
______________
Actual
(Typical 8 in. wc.)
Set optional Low gas pressure switch
______________
Actual
(Typical 3 in. wc.)
Set burner pressure differential
______________
Actual
(Typical 0.65 in. wc.)
Set the maximum firing rate
______________
temp rise
Set the minimum firing rate
______________
check
Set the unit’s operating temperature
______________
degrees F