Step 1 - pour box – FSR SF-IPSP User Manual
Page 4
1
2
3
3
2
1
A
B
D
A
B
D
C
C
244 BERGEN BLVD.
W. PATERSON, NJ 07424
TEL (973) 785-4347
FAX (973) 785-3318
TITLE:
DRAWN BY:
DWG#:
DATE:
REV:
SCALE:
JRE
11/03/08
02
1:3
C-1042B
SMART FIT COVER
FLANGE-TO-POKE POUR BOX
ASSEMBLY INSTRUCTIONS
PAGE:
1
3
OF
FSR
inc.
STEP 1 - POUR BOX
(SHOWN REDUCED IN SCALE)
AC DIVIDER TUBE MAY NEED
MODIFICATION, AS SHOWN
ABOVE, TO ALLOW CLEARANCE
FOR ANY IPS INSERTS WHICH,
BENEATH THEIR FACE PANEL,
ARE AS WIDE AS THE FACE PANEL
OR NEARLY SO (E.G., IPS-C612S,
IPS-V310S, IPS-D710S THRU
IPS-D714S), AND PLACED
IN THE -IPSP POSITION NEAREST
THE A/C OUTLET. PRIOR TO POUR
BOX INSTALLATION, VERIFY IF
THIS MODIFICATION IS REQUIRED
BY EITHER PERUSAL OF INTENDED
INSERTS OR BY TEST FITTING
ASSEMBLY OF ALL COMPONENTS.
5/8"
MAX.
FSR MODEL# SF-PB
AC DIVIDER
(SUPPLIED
WITH SF-IPSP)
BARBED CLIP WITH GROUND
LUG (SUPPLIED WITH SF-PD)
(3) BARBED CLIP
(SUPPLIED WITH SF-PB)
TILE FLANGE FSR MODEL# SF-(X)T-CV
OR CARPET FLANGE (SHOWN BELOW)
FSR MODEL# SF-(X)C-CV
(4) #6-32 x .250 LONG SCREW
(SUPPLIED WITH SF-(X)T-CV
AND SF-(X)C-CV)