beautypg.com

FSR WE-IPAD2/IPAD2NB User Manual

We-ipad2/ipad2nb installation instructions

background image

FSR

244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207

43796

LIT1402

USE SHORT SHELL TYPE

1

2

COVER

(WE-IPAD

SHOWN)

BASE

REMOVE COVER FROM BASE AS SHOWN.

1.

2. SECURE BASE TO WALL (SEE BACK OF THIS PAGE).

FINISHED WALL

2G BOX

BASE

IPAD (SUPPLIED

BY CUSTOMER)

WITH SILICON

SLEEVE (SUPPLIED)

3. INSTALL PROVIDED SILICON SLEEVE TO

IPAD (SUPPLIED BY CUSTOMER) AND
MAKE ELECTRICAL CONNECTIONS AS
REQUIRED. POSITION IPAD IN BASE AND
SUPPORT IPAD FROM FALLING.

WE-IPAD2/IPAD2NB INSTALLATION INSTRUCTIONS

4. REINSTALL COVER AS SHOWN WHILE

SUPPORTING IPAD FROM FALLING.

5. TIGHTEN (2) LOCKING SCREW

COMPLETELY WITH SUPPLIED
DRIVER. DO NOT OVER TIGHTEN.

COVER

SUPPORT IPAD WHILE
REINSTALLING COVER

1

2

LOCKING SCREW
ACCESS HOLE

LOCKING SCREW
ACCESS HOLE

IPAD INTERFACE

CABLE (SUPPLIED

BY CUSTOMER)

(8) CABLE
PASS-THRU
OPENING