Short-form operation instruction – Bronkhorst EX-FLOW Mass Flow User Manual
Page 4
BRONKHORST HIGH-TECH B.V.
Short-Form Operation Instruction
Before installing your Mass Flow Meter/Controller it is
important to read the attached label and check:
- flow rate
- fluid to be metered
- up- and downstream pressures
- input/output signal
Check the red-coloured sticker and make sure the
test pressure is in agreement with normal safety
factors for your application.
Check if the piping system is clean. For absolute
cleanliness always install filters to assure a clean,
moisture- and oil-free gas stream.
Install the Meter/Controller in the line and tighten the
fittings according to the instructions of the supplier of
the fittings. Choose the mounting position according
to the directions given in this manual.
Check the system for leaks before applying fluid
pressure
Electrical connections must be made with a standard
cable or according to the hook-up diagram in the back
of this manual.
Apply power to the instrument and allow for approx.
30 minutes to warm-up and stabilize. This may be
done with or without fluid pressure, applied to the
system.
Your instrument is now ready for operation.