beautypg.com

Hardware preparation and installation, 1 overview, 2 unpacking and inspecting the board – Artesyn iVPX7225 RTM Installation and Use (April 2015) User Manual

Page 27: 1 overview 2.2 unpacking and inspecting the board, Chapter 2, hardware preparation and installation, Outline, Chapter 2

background image

Chapter 2

iVPX7225 RTM Installation and Use (6806800S35B)

27

Hardware Preparation and Installation

2.1

Overview

This chapter describes:

Instructions for inspecting the board

Requirements that have to be observed when using the board

Installation and removal instructions

2.2

Unpacking and Inspecting the Board

Read all notices and cautions prior to unpacking the product.

Shipment Inspection

To inspect the shipment, perform the following steps.

1. Verify that you have received all items of your shipment which includes the

following but are not limited to;

Printed Quick Start Guide and Safety Note

iVPX7225 RTM

Any optional items ordered

Damage of Circuits

Before touching the board or electronic components, make sure that you are working
in an ESD-safe environment.