beautypg.com

Installing the punch-block kit, Location, Kit contents – ARRIS TM508 Installation Guide User Manual

Page 25: Required tools, Procedure: installing the punch-block kit 15

background image

15

TM508/TM512 Installation Guide Release 5 Standard 1.2 Mar 2007

Installing the Punch-Block Kit

Use this procedure to install the ARRIS punch-block kit accessory,
order number 719321, in the wiring closet.

Location

Locate the punch-down block within 6 feet of the rear of the Telephony
Modem. The RJ-21X cable supplied with the kit is 10 feet (3.3m) long;
allow for slack and routing considerations. The selected location should
also allow subscriber telephone lines to reach the punch-down block
with sufficient clearance.

Kit Contents

The punch-block kit contains the following items.

1 Pre-wired Network 66-block with cover

2 24 bridging clips (two for each telephone line)

3 RJ-21X cable

Note:

The supplied RJ-21X cable is wired only for use with TM508

or TM512 Telephony Modems.

Required Tools

You need the following tools to install the punch-block kit. Tools are
available from ARRIS Telewire Supply.

#2 Phillips screwdriver

66-block punch tool

wire cutters

1

2

3

This manual is related to the following products: