NOTE: The bracket images shown below are for illustration purposes only. In actual
assembly the NAT external U-bracket for the 108/NAT or 112/NAT must be used!
IMPORTANT: BEFORE DRIVING THE FAZ II 10/10C ANCHOR INTO THE HOLE, INSURE
THAT THE HEX NUT IS IN THE PROPER POSITION. THE CORRECT POSITION OF THE
HEX NUT IS WHEN 5/64 inches to 1/8
th
inches (2mm TO 3 mm) OF THE THREADED
BOLT IS PROJECTING BEYOND THE END OF THE NUT.
2mm to 3mm this end of thread exposed
3. Mount the 108/NAT or 112/NAT U-bracket over the holes and drive the FAZ II 10/10C
anchor in place as shown.
The FAZ II 10/10C is driven in place as shown below.
The NAT U-bracket must be
in place before the anchor is driven into the hole!
4.
Apply the required torque as shown below in the center image. The required
torque is 33ft lbs (45 NM).
NOTE: The FAZ II 10/10 C is supplied with the correct washer and nut. DO NOT
SUBSTITUTE ANY PARTS!
Additional instructions for installing these concrete anchors are found on the One Systems
web site
in the Documentation section under “Tech Papers/Install
Guides”. The document is ESR 2948.
THIS DOCUMENT MUST BE READ AND
UNDERSTOOD PRIOR TO INSTALLATION!