Appendix a: power consumption, A: p, Ppendix – NEXCOM NISE 2400 User Manual
Page 79: Ower, Onsumption, Test configuration, Power consumption management

Copyright © 2015 NEXCOM International Co., Ltd. All Rights Reserved.
65
NISE 2400 Series User Manual
Appendix A: Power Consumption
a
PPendIx
a: P
ower
C
onsumPtIon
Test Configuration
System
Configuration
Sys#1
Product
NISE 2400
CPU
Intel ® Atom™ CPU E3827 @ 1.75GHz
Power Consumption Management
Purpose
The purpose of the power consumption test is to verify the power dissipation
of system, and the loading of power supply.
Test Equipment
1. 19” LCD Monitor.
2. DC power supply.
3. Operating System OS: Windows 8 (32 bit)
4. Burn In Test Ver7.1
5. Kpower Software.
6. Network test program.
7. USB 2.0 (5V,0.5A (Cement Resistor)) *4.
8. USB 3.0 (5V, 1.0A (Cement Resistor))*1.
device Under Test
DUT: SYS#1
Test Procedure
1. Make sure mechanical structure and electrical functionality are normal
before testing.
2. Install all I/O load devices and according as system input voltage
specifications to setup DC Power supply voltage.
3. Measure system maximum power consumption as below mode:
▪ Standby mode.
▪ BIOS mode.
▪ 100% Full loading mode (Include USB load fixture)
4. Measure and record system maximum power consumption value.