beautypg.com

Appendix a: power consumption, A: p, Ppendix – NEXCOM NISE 2400 User Manual

Page 79: Ower, Onsumption, Test configuration, Power consumption management

background image

Copyright © 2015 NEXCOM International Co., Ltd. All Rights Reserved.

65

NISE 2400 Series User Manual

Appendix A: Power Consumption

a

PPendIx

a: P

ower

C

onsumPtIon

Test Configuration

System
Configuration

Sys#1

Product

NISE 2400

CPU

Intel ® Atom™ CPU E3827 @ 1.75GHz

Power Consumption Management

Purpose

The purpose of the power consumption test is to verify the power dissipation

of system, and the loading of power supply.

Test Equipment

1. 19” LCD Monitor.

2. DC power supply.

3. Operating System OS: Windows 8 (32 bit)

4. Burn In Test Ver7.1

5. Kpower Software.

6. Network test program.

7. USB 2.0 (5V,0.5A (Cement Resistor)) *4.

8. USB 3.0 (5V, 1.0A (Cement Resistor))*1.

device Under Test

DUT: SYS#1

Test Procedure

1. Make sure mechanical structure and electrical functionality are normal

before testing.

2. Install all I/O load devices and according as system input voltage

specifications to setup DC Power supply voltage.

3. Measure system maximum power consumption as below mode:

▪ Standby mode.

▪ BIOS mode.

▪ 100% Full loading mode (Include USB load fixture)

4. Measure and record system maximum power consumption value.

This manual is related to the following products: