beautypg.com

Potable water systems cont – WaterFurnace Envision Hydronic (NSW) User Manual

Page 9

background image

9

NSW INSTALLATION MANUAL

NOTES:

1) Unions and valves must be installed so that acid flushing

of the heat exchanger is possible.

2) Route thermistor wires to NSW. Remove yellow

thermistor wires on TB 3 and 4 from control box and

connect thermistor wires from geothermal storage tank.

Set the pump sampling (PS) in the set up of the control

board to continuously (C) sampling (reference Note 5 in

the Wiring Schematic).

Hot Water Generator Connections

The heat reclaiming hot water generator coil is vented double-

wall copper construction and is suitable for potable water. To

maximize the benefits of the hot water generator a minimum

50-gallon water heater is recommended. For higher demand

applications, use an 80-gallon water heater as shown below or

two 50-gallon water heaters connected in a series. A geo storage

tank should not be used in this application unless it is plumbed

in a series with an electric water heater. The geo storage tank

is equipped with a single 4500 Watt element and will not be

able to provide adequate water heating if used as a standalone

water heater. Electric water heaters are recommended. Make

sure all local electrical and plumbing codes are met for installing

a hot water generator. The Envision NSW is not supplied with

an internal circulator. A DPK5 kit will need to be purchased to

connect to the hot water generator. The DPK5 kit is supplied with

installation instructions, circulator, tank adaptor and temperature

limit switch. Be sure to burp (vent) the pump. Open the screw

2 turns only in the end of the pump motor (if Grundfos

®

pumps

are used) to allow trapped air to be discharged and to ensure the

motor housing has been flooded.

Potable Water Systems cont.

Alternate Hot Water Installation with
Direct Coupling to a Double Wall Unit

>B>]`ba

>B>]`ba

0OZZDOZdS

2WSZSQb`WQ

C\W]\a

2WSZSQb`WQ

C\W]\a

EObS`4c`\OQS

eWbV2]cPZSEOZZ:]OR1]Of

EObS`4c`\OQS

53=B/<9

Þ
4>B

0OZZDOZdS

6=B

1=:2

:==>473:2

4:=E13

NOTES:

1) Unions and valves must be installed so that acid flushing

of the heat exchanger is possible.

2) Make sure there is not a check valve in the diptube of

the tank.

3) Route thermistor wires to NSW. Remove yellow

thermistor wires on TB 3 and 4 from control box and

connect thermistor wires from geothermal storage tank.

Set the pump sampling (PS) in the set up of the control

board to continuously (C) sampling (reference Note 5 in

the Wiring Schematic).