beautypg.com

Wiring schematics - commercial cont, Nsw installation manual – WaterFurnace Envision Hydronic (NSW) User Manual

Page 21

background image

21

NSW INSTALLATION MANUAL

Wiring Schematics - Commercial cont.

NSW Heating Only - 208-230/60/3

Transformer

Red 208V

Blk/Wht

NOTE 1

Yellow

Blue 230V

Black

97P799-05

4/02/09

SHC Secondary Unit

Heat/Cool

SE

Secondary Unit

Enable

LV

Load Valve

Output

L

Alarm

X1

Acc 1

X2

Acc 2

PO

Primary Load

Over-ride Output

SN

Secondary

24VAC Input

R

24VAC

ES

Emergency

Shutdown

9DC

9 VDC - Use

for CP and ES

CP

Compressor

Proving Switch

SF Source Flow

Proving Switch

O

Rev Valve

Y1

Comp 1

LF

Load Flow

Proving Switch

POI Primary Load

Over-ride Input

C

24V COM

18

17

16

15

14

12

11

10

9

13

8

7

6

3

4

5

2

1

Black (SHC)

Black (R)

Black (LV)

Black (X2)

Black (X1)

Black (L)

Black (PO)

Black (SE)

Black (SN)

Black (C)

Black (LF)

Black (POI)

Black (O)

Black (SF)

Black (Y1)

Black (ES)

Black (9DC)

Black (CP)

HP

Black (40)

Black (38)

Black (35)

Black (33)

Black (31)

Black (30)

Black (28)

Black (27)

Yellow (21)

Yellow (29)

Black (36)

Black (55)

Black (56)

Black (58)

NOTE 6

Black (53)

NOTE 7

Black (57)

CC

Green/Yellow (72)

ES

Emergency
Shutdown

9 DC

9 VDC - Use
for CP and ES

CP

Compressor
Proving Switch

SF

Source Flow
Proving Switch

O

Rev Valve

Y1

Comp 1

SHC

Secondary Unit
Heat /Cool

SE

Secondary Unit
Enable

LV

Load Valve Output

L

Alarm

X1

Acc 1

X2

Acc 2

PO

Primary Load
Over-ride Output

SN

Secondary
24VAC Input

R

24VAC

LF

Load Flow
Proving Switch

POI

Primary Load
Over- ride Input

C

24V COM

TB

Field Connection Diagram

(For units using Set Point control mode

with or without a secondary unit.)

To Primary Load Over-ride Input

(POI) of secondary unit.

To Y1 input of secondary unit.

To R from secondary unit.

To O input of secondary unit.

NOTE 8

NOTE 6

NOTE 7

NOTE 9

ES

Emergency
Shutdown

9 DC

9 VDC - Use
for CP and ES

CP

Compressor
Proving Switch

SF

Source Flow
Proving Switch

O

Rev Valve

Y1

Comp 1

SHC

Secondary Unit
Heat /Cool

SE

Secondary Unit
Enable

LV

Load Valve Output

L

Alarm

X1

Acc 1

X2

Acc 2

PO

Primary Load
Over -ride Output

SN

Secondary
24VAC Input

R

24VAC

LF

Load Flow
Proving Switch

POI

Primary Load
Over- ride Input

C

24V COM

TB

Field Connection Diagram

(For units using aqua stat control

mode.)

NOTE 8

NOTE 6

NOTE 7

NOTE 9

Aqua Stat Y1

NOTE 10

Violet (70)

Black (54)

PB1

2
1

3