5. FINAL CHECK
A. Check all fittings, hose and clamps for tight-
ness and leaks. Make sure all wires and lines
are properly secure with clamps or tie wraps.
B. Make sure all wires and hoses are routed
away from hot, moving or sharp objects.
C. Double check to ensure water is flowing
through the CAC system. (If equipped.)
D. Test drive the vehicle.
E.
Always listen carefully for engine detonation.
Discontinue heavy throttle usage if detonation
is heard.
WARNING: Do not attempt to operate the vehicle until ALL
components are installed and ALL operations are
completed including the final check.
• Custom ECM programming and fuel / ignition system
upgrades will be required when changing the super-
charger drive pulley to any size other than what was
originally supplied in the complete supercharger kit.
• A Vortech Maxflow Race or Mondo compressor bypass
valve is requires for applicaitons producing more than
11-12 psig.
NOTE: Check to see that CAC coolant is flowing
through the surge tank. If coolant is not flow-
ing, remove the 3/4" rubber hose from the side
of the surge tank and apply light suction in an
attempt to pass any trapped air in the system.
Reconnect the hose and recheck coolant flow.