beautypg.com

SOR RT Nuclear Qualified Pressure Switch User Manual

SOR Sensors

background image

Form 1472 (05.13) ©SOR Inc.

1/4

Nuclear Qualified

Pressure Switch

with Terminal Block

General Instructions

Be certain the process connection is tightened and positioned so bending
and torsional forces imposed on pressure switch are minimal. Use care
not to loosen pressure port from body or body from housing.

NOTE: If you suspect that a product is defective,
contact the factory or the SOR

®

Representative in

your area for a return authorization number (RMA).
This product should only be installed by trained
and competent personnel.

Installation

The vent connection must be plugged or vented to dry atmosphere as required by
application requirements. Test Data Sheet SOR form #716 is supplied for each serial
number and provides switch performance data in the vented and plugged condition.

Design and specifications are subject to change without notice.

For latest revision, go to sorinc.com

Failure to mount the housing on a fl at mounting surface may result in
torsional forces on the housing that could cause false trips or render the
pressure switch inoperative.

Process Connection

Securely connect process line to pressure port using two wrenches: one to hold hex flats
on pressure port, the other to tighten process pipe or tube fitting.

.

to dry atmosphere as required by

These instructions provide information for
installation, process connection, electrical
connection and calibration of Nuclear Qualified
Pressure Switch with Terminal Block.