beautypg.com

7 boiler fixing, 8 gas / water connections – Glow-worm Ultracom cx User Manual

Page 16

background image

16

8.1 Systems Connection

Remove the protective caps from the boiler connections.
NOTE: The appliance may contain a small amount of water,

place a water container beneath the boiler connections
Assemble and secure the pre formed copper tails to their

respective isolation valves making sure of their correct

orientation, see diagram 8.1.
Fit the isolation valves/copper tails with seals to the appliance

as shown in diagram 8.1
Make sure that all connections are secured in the sequence

shown on diagram 8.1.
There are flats on the body of the valves for locating a

spanner to aid tightening.
Fit the ‘O’ ring seal from the loose items pack to the Double

Check Inlet Valve assembly then secure into isolation valve

with wire retaining clip, see diagram 8.1.

13713

Diagram 7.2

7 Boiler Fixing

Fit the Central Heating Isolation Valve handles and secure

with screws provided.
NOTE: Make sure the test and drain points are accessible,

refer diagram 8.1.
Plumb the system pipe work to the copper tails.
NOTE: Do not subject service cocks to heat.
Flush out the domestic hot water and the heating systems,

refer to section 5.8.
The whole of the gas installation, including the meter, should

be inspected, tested for tightness and purged in accordance

with the current issue of BS6891 and in IE the current edition

of I.S.813 “Domestic Gas Installations”.

7.1 Hanging Bracket Fixing

The Wall Hanging Bracket is supplied in the main boiler

packaging at the rear of the boiler.

Reposition the wall template over the flue hole and mark

the position of the fixing holes for the hanging bracket, see

diagram 7.1.
Drill fixing holes and insert suitable wall plugs.

Diagram 7.1

13503

7.2 Boiler Hanging

IMPORTANT: With regards to the Manual Handling

Operations, 1992 Regulations, the following lift operation

exceeds the recommended weight for a one man lift, refer to

section 17 Manual Handling.

Lifting the boiler into position, lean the top of the boiler slightly

to the wall and position just above the hanging bracket. Lower

the boiler slowly and engage onto the hanging bracket, see

diagram 7.2.

8 Gas / Water Connections