beautypg.com

6 installation preparation – Glow-worm Ultracom cx User Manual

Page 15

background image

15

6.1 Appliance Pack

Please check the contents of packs as shown in diagram 6.1.

The packs are located in the top polystyrene packing.

Remove the carton sleeve and top pack then lift the boiler and

its polystyrene base support out of the lower pack.

6.2 Site Requirements

The boiler mounting wall should be suitable for the weight of

the appliance and be true and flat.

NOTE: Due to the varied site conditions we do not supply

fixings and advise that the installer should supply those which

are suitable.

6.3 Wall Template

Take the wall template from the document pack located within

the top polystyrene packing

and place in the desired position

on the wall, giving due consideration to the required boiler

clearances,

see section 3

, and the flue you are fitting.

Mark the position of the flue centre, if fitting a side flue, extend

the flue centre line into the corner then 158mm along the

adjacent wall.
For extended side flues, the flue hole centre should be

determined by extending the dashed inclined line on the

template to the side wall. This dashed line is drawn at 44mm/

metre (2.5°) rise from the boiler. Where this line reaches the

side wall, a horizontal line should be marked. The vertical

centre line of the flue should then be marked at 176mm from

the back wall.
To allow for the flue passing through the wall at this angle

a 125mm hole should be drilled irrespective of internal or

external installation.
Remove the wall template whilst drilling the flue hole.

6.4 Flue Hole Cutting

External access flue installation can use a 105mm diameter

core drill.
Internal access only flue installation will need a 125mm

diameter core drill.
NOTE: The flue is designed with an internal fall of 44mm/

metre (2.5°), therefore the hole can be drilled horizontally.
If flue extension pipes are to be used then a core drill size of

125mm is required. This will allow the extension pieces to

slope at 44mm/metre (2.5°) towards the boiler.

6 Installation Preparation

13853

Diagram 6.2