beautypg.com

Maintenance – Glow-worm Ultimate c User Manual

Page 42

background image

0020167175_01 - 02/13 - Glow-worm

18.2 Boiler

Access

For replacement of parts, the front casing panel of the boiler will

need to be removed.

To remove undo the two screws on the underside of the front

casing and lift off .

18.3 Viewing

window

3

4

5

2

1

Key

1 Fibre

washer

2 Steel

washer

3 Glass

4 Steel

washer

5 Circlip

Remove the circlip (5).

Remove the steel washer (4).

Remove fi bre washer (1).

Remove the glass (3).

18.3.1 Expansion

vessel

B

C

D

E

A

3

2

1

4

2

1

Key

1 Connector

2 Expansion

vessel

3 Upper support bracket

4 Retaining

screw

5 Gasket

Drain the boiler heating circuit as described in the appropriate

chapter "Draining".

Remove the two screws (4).

Undo the connector (1) at the base of the vessel.

Remove upper support bracket (3).

Remove the expansion vessel (2).

Fit a new gasket between the expansion vessel and connector.

Refi ll, vent and pressurise the boiler.

MAINTENANCE

- 40 -