beautypg.com

Installation, 12 specifi ed adjustment, 9 testing domestic hot water system – Glow-worm Ultimate c User Manual

Page 26: 10 completion, 1 heating circuit adjustment

background image

0020167175_01 - 02/13 - Glow-worm

11.9 Testing domestic hot water system

Open a hot-water tap.

Check that the temperature obtained is compliant with the

setting on the appliance.

11.10 Completion

Ensure that the magnetic lighting instruction label is placed on

the surface of the boiler casing.

GB: It is a requirement that the “Benchmark” Installation,

Commissioning and Service Record is completed and left with the

user.

IE: it is necessary to complete a “Declaration of Conformity” to

indicate compliance to I.S.813. An example of this is given in the

current edition of I.S.813.

12 Specifi ed Adjustment

12.1 Heating circuit adjustment

By pass operation is automatic and not adjustable.

If necessary, fi t an external by-pass.

ULTIMATE 30c

B

0

10

20

30

40

50

500

1000

1500

Key

A Available pressure between heating fl ow and return (kPa)

B Heating

circuit

fl ow rate (l/h)

ULTIMATE 35c

0

10

20

30

40

50

60

500

1000

1500

B

Key

A Available pressure between heating fl ow and return (kPa)

B Heating

circuit

fl ow rate (l/h)

INSTALLATION

- 24 -