beautypg.com

4 heating system – Glow-worm Energy Saver 80 - 100 and Gave Valve User Manual

Page 12

background image

12

221564F

7265

Diagram 4.2

Diagram 4.3

6597

MANUAL
BYPASS
VALVE

4.6 Water Treatment

For optimum performance after installation, the boiler and its
associated central heating system should be flushed in
accordance with BS7593:1992 using a cleanser such as Sentinel
X300 or X400, or Fernox Superfloc.

For long term corrosion protection, after flushing, an inhibitor
suitable for aluminium heat exchangers should be used.
Examples are Sentinel X100 and Fernox Copal.

4.7 Draining Tap

A draining tap must be provided at the lowest points of the
system, which will allow the entire system to be drained.

The flow and return isolation valves are provided with drain
points for boiler heat exchanger drainage, see diagram 8.1.

4 Heating System

BOILER

DOMESTIC

WATER

HO

T

COLD SUPPL

Y

DRAIN
POINT

'B'

'A'

FLOW CONTROL
VALVE

HEATING
CIRCUIT

RETURN

ADDITIONAL
EXPANSION
VESSEL
(if required)

OPTIONAL
BY-PASS
VALVE

OPTIONAL FILLING
ARRANGEMENTS,
SEE DIAGRAM 4.4

C

METHOD 1

METHOD 2

SUPPLY STOP
VALVE

SUPPLY
PIPE

HOSE
UNIONS

SERVICING
VALVE

TEMPORARY
HOSE

HEATING
SYSTEM

HEATING
SYSTEM

TEMPORARY
HOSE

HOSE
UNIONS

SERVICING
VALVE

SUPPLY
PIPE

SUPPLY STOP
VALVE

DOUBLE CHECK
VALVE ASSEMBLY

COMBINED
CHECK VALVE
AND VACUUM
BREAKER

C

C

Diagram 4.4

7266