Rt80q operator’s manual – Ditch Witch RT80 User Manual
Page 96
RT80Q Operator’s Manual
Trench - 95
Operation
CMW
9.
If using optional hydraulic trench cleaner:
•
Trench forward a short distance.
•
Move hydraulic control lever to lower trench cleaner, and continue trenching.
10. Push ground drive control forward to trenching speed.
11. When trench is complete, move ground drive control to neutral.
12. Adjust throttle to low idle.
13. Raise boom.
14. As boom clears top of trench, move attachment speed/direction control to neutral.
15. Drive a short distance away from work site.
16. Shut down tractor. See page 78 for proper shutdown procedures.
17. Return optional trench cleaner to the stowed position.
NOTICE:
•
Do not make sharp turns. Lower boom to full depth when turning.
•
If an object becomes lodged in chain, move attachment speed/direction control to neutral
and raise boom slightly. Reverse chain direction. If object must be removed manually, turn
engine off and engage parking brake.
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)