Planning, Trenching, Plowing – Ditch Witch RT80 User Manual
Page 65: Rt80q operator’s manual
Operation Overview - 64
RT80Q Operator’s Manual
Planning
CMW
Planning
1.
Gather information about jobsite. See 68.
2.
3.
Classify jobsite. See page 70.
4.
Select chain and teeth to match your soil type, if necessary. See page 129.
5.
Check supplies and prepare equipment. See page 72.
6.
Haul equipment to jobsite. See page 79.
Trenching
1.
2.
Position tractor and controls. See page 92.
3.
4.
Engage cruise control if desired. See page 126.
5.
Engage optional Trench Depth Meter, if equipped.
6.
Complete the installation. See page 133.
7.
Shut down tractor. See page 78.
Plowing
1.
2.
Position tractor and controls. See page 99.
•
•
coordinated plowing - page 103
•
3.
4.
5.
Engage cruise control if desired. See page 126.
6.
Complete the installation. See page 133.
7.