Trencher, Plow, Rt80q operator’s manual – Ditch Witch RT80 User Manual
Page 154
RT80Q Operator’s Manual
Service - 153
50 Hour
Trencher
Check Trencher Gearbox Oil Level
Check oil at sight tube every 50 hours. Keep oil
level at horizontal line (shown) on housing. If
necessary, add MPL at fill plug.
Plow
Change Plow Vibrator Oil
Change plow vibrator oil after first 50 hours of
operation. Drain oil at drain plug (2). Replace plug
and move plow vibrator to horizontal position.
Add MPL at fill (1) until oil is halfway up sight
glass (2). Refill capacity is 4 qt (3.8 L).
Check Plow Lift Cylinder Pins and
Bumpers
Check plow lift cylinder pins and bumpers every
50 hours.
Replace as needed.
IMPORTANT: Do not drain oil from plow
vibrator when hot. Let plow vibrator cool
before removing drain plug.
t33om079w.eps
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)