Rt80q operator’s manual – Ditch Witch RT80 User Manual
Page 58
RT80Q Operator’s Manual
Controls - 57
Backhoe Console
CMW
Item
Description
Notes
1.
Stabilizer lock
To release, step on pedal.
Locks automatically as
stabilizer is fully raised.
2.
Left stabilizer control
switch
To lower, press left.
To raise, press right.
3.
Boom/Swing control
To swing boom left, move left.
To swing boom right, move
right.
To raise boom, pull.
To lower boom, push.
Control can perform more than one
action at a time. By “feathering” the
control, operator can combine
backhoe operations.
NOTICE: Do not operate with
backhoe in the stowed (upright)
position.
4.
Remote throttle switch
To increase engine speed,
press top.
To decrease engine speed,
press bottom.
c00ic646w.eps
c00ic243h.eps
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)