20 hour, Power unit – Ditch Witch Zahn User Manual
Page 70
R150/R230/R300 Operator’s Manual
Service - 69
20 Hour
CMW
20 Hour
Power Unit
Change Engine Oil (Initial) - R150
Change engine oil after the first 20 hours of
operation.
1.
Move drain hose (1) to front of unit and drain
while oil is still warm.
2.
Replace plug.
3.
Add 1.6 qt (1.1 L) of GEO at fill neck (2).
Location
Task
Notes
Power Unit
Change engine oil - R150
Initial service, GEO
Change engine oil and filter - R230/R300
Initial service, GEO
Trencher
Lube trail wheel
MPG
Lube headshaft bearing
MPG, headshaft auger
trencher only
IMPORTANT: If operating in extremely dusty
conditions, change oil more frequently. Use oil
specified in temperature chart found in
“Recommended Lubricants/Service Key” on
page 62.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)