Assembly, Unpack carton & install handle (see fig. 2) – Husqvarna 917.29939 User Manual
Page 5
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
![background image](/manuals/719920/5/background.png)
ASSEMBLY
UNPACK CARTON & INSTALL HANDLE
(See Fig. 2)
A
CAUTION: Be careful of exposed
staples
when handling or disposing of carton
ing material.
IMPORTANT: WHEN UNPACKING AND ASSEMBLINGTILLER,
BE CAREFUL NOT TO STRETCH OR KINK CABLE(S).
Cut
cable ties securing handle column.
Route cable(s) as shown and slide handle column onto
handle mount.
Remove all packing from carton.
Secure handle column using two (2) carriage bolts and
two (2) flange locknuts. Tighten securely.
Cut away carton.
Route tine control cable(s) through plastic cable clip
on handle mount,
NOTE:
Cables must not touch the muffler,
•
Cut cable ties securing tiller to skid. Remove tillerfrom
skid by pulling backwards,
•
Remove screws securing depth stake to skid and dis
card the screws.
INSTALL DEPTH STAKE ASSEMBLY
(See Fig. 3)
•
Loosen nut “A”,
•
Insert stake support between engine bracket halves
with stake spring down,
•
Bolt stake support to engine brackets with bolts, lock
washers and nuts. Tighten securely. Tighten nut 'A',
•
Depth stake must move freely. If it does not, loosen
support bolt.
HANDLE HEIGHT
•
Handle height may be adjusted to better suit operator,
(See “HANDLE HEIGHT” in the Service and Adjust
ments section of this manual),
TILLING WIDTH
•
Tilling width may be adjusted to better handle your
tilling conditions (See “TINE ARRANGEMENT” in the
Service and Adjustments section of this manual),
TINE OPERATION
•
Check tine operation before first use, (See “TINE OP
ERATION CHECK” in the Service and Adjustments
section of this manual).