Start-up check sheet for 90+ furnace – Sears 9MPD User Manual
Page 3
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

START-UP CHECK SHEET
For 90+ Furnace
(Keep this page for future reference)
Dealer Name:_
Address:______
City, State(Province), Zip or Postal Code:_
Phone:
Owner Name:
Address:_____
City, State(Province), Zip or Postal Code:_
Model Number:__________________________
Serial Number:___________________________
Type of Gas:
Natural:
Q LP: Q
Which blower speed tap is used?
(Heating)___________(Cooling)___
Temperature of Supply Air:
Temperature of Return Air:
(+).
(+)_
_or(X)_
_or(°C)_
Rise (Supply Temp.-Return Temp.): (°F)_______or(°C)_
Filter Type and Size:____________________________
Fan "Time ON" Setting:_
Fan "Time OFF" Setting:,
Dealer Comments:
Business Card Here
Manual Gas Shut-Off Upstream
of Furnace/Drip-Leg?
YES
□
NO
□
Condensate Drain Connected? YES □ NO □
Condensate
Drain
Trapped?
YES
□
NO
□
Transition Pressure switch hose relocated for U/D/H
Application? YES □ NO □
Blower Speed Checked? YES □ NO □
All Electrical Connections Tight? YES □ NO □
Gas Valve OK? YES □ NO □
Measured Line Pressure When Firing Unit:_______________
Calculated
Firing
Rate:(See
Checks
andAdjustmentsSec-
tion).______________________________________________
Temperature Rise (supply-return temperature):(°F)__________
Measured Manifold Gas Pressure:______________________
Static Pressure (Ducts): Supply Air_
Date of Start-Up:_________________
CO? ___________________________
C 0 2 ? _________________________
Return
44001
1114
00
a