Sears 300 User Manual
Page 11
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

20. Feed the Short Cable (44) around one of the
4 1/2” Pulleys (85).
Feed the Short Cable (44) up over the 3 1/2”
Pulley (12) in the Pivot Arm (91) as shown.
21. AtUch the S'.'.oi; Cha,;. (52) L ;t-jVc.3ri the Short
Cable (44) and the 3/8” Eyebolt (55) in the Small
Weight Cover (54) with two Cable Clips (53).
22. Attach a 3/8” x 3 3/4” Bolt (83), two 3/8” Washers
(4), the 1/2” X 1 1/4” Spacer (84), and a 3/8” Jam
Nut (2) to the lower hole in the Squat Upright
(71).
Find the end of the Long Cable (45) where the
rubber ball is located. Route the Long Cable up
around a 3 1/2” Pulley (12). Attach the Pulley to
the indicated side of the Squat Upright (71) with a
3/8”
X
3 1/2” Bolt (82), a 3/8” Flat Washer (4), and
a 3/8” Jam Nut (2).
Note: Make sure that the
Long Cable is between the Pulley and the 1/2”
X 1 1/4” Spacer (84).
23. Lay the Long Cable (45) over a 3 1/2” Pulley (12).
Attach the Pulley and two Pulley Covers (13) to
the Squat Arm (72) with a 3/8” x 3 1/4” Bolt (5)
and a 3/8” Jam Nut (2). Make sure that the Pulley
is attached to the indicated side of the Squat Arm.
Make sure that the Pulley Covers are turned
so the wide tabs are positioned as shown.
11