Sears 580.32601 User Manual
Page 7
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
SECTION 1
PREPARATION FOR USE
Alternator Unpacking and Removal from Shipping Skid
2. Two
1/4
Inch bolts and hex nuts retain the
alternator cradle to the wood shipping pallet.
Use two 7/16 inch wrenches to remove bolts
and hex nuts. Alternator can then be removed
from wood pallet.
1. The alternator is bolted to a wood shipping
pallet. The cardboard is then set into position
and retained with straps. Location of alter
nator and wheel kit in shipping carton is
shown above. To remove carton, cut the
straps and lift cardboard carton straight up
and off paliet.
PARTS SHIPPED WITH ALTERNATOR
The following items are shipped with the alternator and must be installed or assembled. To order
additional items listed below, refer to REPAIR PARTS section of this manual.
1. Battery Hold-Down Bracket with retaining hardware
2. Wheel Kit
3. One 5 gallon Fuel Tank with retaining strap
4. One 120 Volt, 3-Prong, 30 Amp Connector Plug
5. One 240 Volt, 20 Amp, 4-Prong Connector Plug
The battery retaining bracket and hardware
are shown at right. The 12 volt battery is to be
supplied by the customer. Make sure all of
the following have been received:
gf Item Description
□ 1
Bracket (1 Req’d)
□ 2
Bolt - V
4-20
X
7” long (2 Req’d)
□ 3
Flatwasher -
V
4
"
(2 Req’d)
□ 4 Lockwasher - V
4
”
(2
Req’d)
□ 5 Wing Nut -
1
/
4-20
(2 Req’d)