Carrier 58DX User Manual
Page 2
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
HOLE IN
FLOOR
3
Fig. 2—Floor Opening for Concrete Slab
Insteillation requires the following;
*1. Inspection
*11. Furnace Location
*III. Gas Piping
*IV. Combustion-Air and Vent Piping
*V. Condensate Piping
VI. Supply-Air Plenum Installation
VII. Electrical
VIII. Sequence of Operation
IX. Fdter
*X. Startup and Adjustment
XI. Care and Maintenance
*For these sections (or installation steps), refer to the appro
priate sections of “Procedures for Downflow Condensing
Furnaces” booklet packaged with this unit.
For accessory instedlation details, refer to the applicable
installation hterature.
NOTE:
Remove all shipping brackets and materials before
operating the furnace.
VI. SUPPLY-AIR PLENUM INSTALLATION
A.
Installation on a concrete slab
1. See Fig. 5 for dimensions and location of supply-air
opening in furnace bottom.
2. Construct hole in floor per dimensions in Fig. 2 and
Table 1.
3. Place plenum and furnace as shown in Fig. 3.
Table 1—Opening Dimensions
Furnace
A
B
Width
Furnace
Furnace & Coil*
171/2
16 1/8
19 5/8
19 7/16
21
19 5/8
19 5/8
19 7/16
241/2
231/8
19 5/8
19 7/16
Fig. 4—Furnace, Plenum, and
Base Installed on a Combustible Floor
*These dimensions appiy when a Model 28RC or 28RD Evaporator Coil
casing is to be installed.
B. Installation on a combustible floor
1. Read Installation Instructions packaged with down
flow subbase.
2. Cut and frame hole in floor per dimensions in Installa
tion Instructions packaged with downflow subbase. If
this requires cutting of a floor joint, tie ends of cut
joist into adjacent joists so that proper floor support
wUl be maintained.
Table 2—Dimensions (In Inches)
Size
A
D
E
040
171/2
15 7/8
16
060
171/2
15 7/8 .
16
080
21
19 3/8
191/2
100
24 1/2
22 7/8
23
A87297
WA
Fig. 5—Dimensional Drawing
2