beautypg.com

Carrier 58DX User Manual

Page 2

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

HOLE IN

FLOOR

3

Fig. 2—Floor Opening for Concrete Slab

Insteillation requires the following;

*1. Inspection

*11. Furnace Location

*III. Gas Piping

*IV. Combustion-Air and Vent Piping

*V. Condensate Piping
VI. Supply-Air Plenum Installation

VII. Electrical

VIII. Sequence of Operation

IX. Fdter
*X. Startup and Adjustment

XI. Care and Maintenance

*For these sections (or installation steps), refer to the appro­

priate sections of “Procedures for Downflow Condensing
Furnaces” booklet packaged with this unit.

For accessory instedlation details, refer to the applicable
installation hterature.

NOTE:

Remove all shipping brackets and materials before

operating the furnace.

VI. SUPPLY-AIR PLENUM INSTALLATION

A.

Installation on a concrete slab

1. See Fig. 5 for dimensions and location of supply-air

opening in furnace bottom.

2. Construct hole in floor per dimensions in Fig. 2 and

Table 1.

3. Place plenum and furnace as shown in Fig. 3.

Table 1—Opening Dimensions

Furnace

A

B

Width

Furnace

Furnace & Coil*

171/2

16 1/8

19 5/8

19 7/16

21

19 5/8

19 5/8

19 7/16

241/2

231/8

19 5/8

19 7/16

Fig. 4—Furnace, Plenum, and

Base Installed on a Combustible Floor

*These dimensions appiy when a Model 28RC or 28RD Evaporator Coil

casing is to be installed.

B. Installation on a combustible floor

1. Read Installation Instructions packaged with down­

flow subbase.

2. Cut and frame hole in floor per dimensions in Installa­

tion Instructions packaged with downflow subbase. If
this requires cutting of a floor joint, tie ends of cut

joist into adjacent joists so that proper floor support
wUl be maintained.

Table 2—Dimensions (In Inches)

Size

A

D

E

040

171/2

15 7/8

16

060

171/2

15 7/8 .

16

080

21

19 3/8

191/2

100

24 1/2

22 7/8

23

A87297

WA

Fig. 5—Dimensional Drawing

2