Slant/Fin VHS-180 User Manual
Page 6

V
ICTORY
II
VHS Models
6
Heat-Fab Saf-T Vent System
Boiler
Model No.
Minimum
Length, Ft.
0 to
5500 Ft.
Altitudes
5500 to
7000 Ft.
Altitudes
7000 to
10,000 Ft.
Altitudes
Equivalent
Length of
each 90°
Elbow, Ft.
Max. Equivalent Length (Ft.)
VHS-30,
40
40
40
3
2
60, 90
and 120
VHS-150
40
40
20
3
2
VHS-180
40
20
20
3
2
ProTech FasNSeal System
Boiler
Model No.
Minimum
Length, Ft.
0 to
5500 Ft.
Altitudes
5500 to
7000 Ft.
Altitudes
7000 to
10,000 Ft.
Altitudes
Equivalent
Length of
each 90°
Elbow, Ft.
Max. Equivalent Length (Ft.)
VHS-30,
30
30
30
6
2
60, 90
and 120
VHS-150
30
30
15
6
2
VHS-180
30
15
15
6
2
Flex-L StaR-34 and Z-Flex Z-Vent System
Boiler
Model No.
Minimum
Length, Ft.
0 to
5500 Ft.
Altitudes
5500 to
7000 Ft.
Altitudes
7000 to
10,000 Ft.
Altitudes
Equivalent
Length of
each 90°
Elbow, Ft.
Max. Equivalent Length (Ft.)
VHS-30,
35
35
35
6
2
60, 90
and 120
VHS-150
35
35
18
6
2
VHS-180
35
18
18
6
2
Note: Vent termination is in addition to the allowed equivalent length.