beautypg.com

Reznor Carryover Lighter Tube Parts Manuals User Manual

Page 4

background image

Form RZ-NA-P-X/XE-LTR-TUBE, Page 4

800-695-1901

www.RezSpec.com

©2044 5H]QRU//& All rights reserved.

Printed in U.S.A.

MANUFACTURER OF GAS, OIL, ELECTRIC HEATING AND VENTILATING SYSTEMS
Trademark Note:

Reznor

®

is registered in the United States and other countries.

04 OG POD

Form P-X/XE-LTR-TUBE9HUVLRQ

INSTALL LIGHTER TUBE GAS CONNECTIONS (cont'd) - Steps 12-19 apply to Propane Gas
Units ONLY

14. Install 1/4" tubing into straight brass fitting and

tighten.

15. Place tag on tubing.

17. Install correct carryover orifice

and brass compression fitting. See
Step 18.

18. If fit is tight, lightly tap orifice into position.

19. Install tubing between orifice and regulator. Leak

test all fittings prior to placing into operation.

16. Install the regulator with the

90

o

elbows already installed

and position as shown. Be sure
gas flow is in the direction of
the arrow on the regulator.
Slide the nut and ferrule on the
90

o

elbow over the tubing and

tighten in place.
Verify that the gas flow is in
the direction of the arrow on
the regulator and that the
regulator gas pressure is set for
1.0" w.c. on propane gas.

WARNING: All components of gas supply system must be leak tested prior to placing
equipment into service. Never test for leaks with an open flame. Failure to comply could
result in severe personal injury or death. Use an approved leak-test solution or soap
solution to detect leaks.