beautypg.com

Reznor Carryover Lighter Tube Parts Manuals User Manual

Page 3

background image

Form RZ-NA-P-X/XE-LTR-TUBE, Mfg #101147, Page 3

INSTALL LIGHTER TUBE GAS CONNECTIONS - Steps 12-19 apply to Propane Gas Units
ONLY

12. Remove the pipe plug from the manifold.

If the unit has a lighter tube with natural gas and is
being converted to propane gas, remove the 90°
elbow, the tubing, and the lighter tube orifice.

13. Install the straight brass fitting in the manifold.

9. Install correct carryover orifice and brass compres-

sion fitting. See Step 10.

10. Insert the carryover orifice into the lighter tube. If

fit is tight, lightly tap the orifice into position.

11. Install tubing and tighten. Leak test prior to placing

unit into operation.

WARNING: All components of gas
supply system must be leak tested prior
to placing equipment into service.

Never test for leaks with an open flame.
Failure to comply could result in severe
personal injury or death. Use an
approved leak-test solution or soap
solution to detect leaks.