Reznor R6GP Option - Installation - Bottom Power Entry User Manual

Page 4

background image

4

7. On the left side of the unit control panel, behind

the low-voltage connection box, remove the 1”
diameter Heyco bushing from the base of the control
panel and install the remaining ¾” diameter FMC
connector.

8. Install the two insulator sleeves in the ends of the

¾” diameter fl exible metal conduit and then install
the conduit fully into the connectors and secure it
in place.

9. Install the 7/8” diameter star bushing into the bottom

hole on the bottom power entry box and one of the
1-1/4” diameter FMC connectors in the remaining
(top,front) hole of the bottom power entry box.

Figure 4.

Figure 6.

Figure 5.

10. On the base of the Blower compartment / Condenser

section external divider panel, remove the plastic
button plug and open up the slit in the insulation.

Figure 7.

11. Install the remaining 1-1/4” diameter FMC

connector.

12. Insert the two 1-1/4” insulator sleeves into the ends

of the 1-1/4” fl exible metal conduit and install the
conduit into the two connectors. Secure the conduit
in place.