beautypg.com

Reznor R6GP Option - Installation - Bottom Power Entry User Manual

Page 3

background image

3

Installation Instructions:

1. Remove unit control panel, blower access door

and fi eld-wiring, electrical element access door are
removed. (Refer to unit installation instructions,
Physical data pages)

2. If applicable, it is recommended to install any other

accessory kits in the unit prior to completing this
kits installation.

6. Install one of the ¾” diameter FMC connectors to

the top, rear, conduit opening in the bottom power
entry box. Angle the connectors tightening screw
up towards blower to allow access when next
connector is installed in front of it. (see Figure 3)

Figure 1.

Figure 2.

Figure 3.

3. Remove the bottom power kit base-plate installed

in the unit, under the units blower, by removing
the four attaching screws. (see Figure 1, save
screws)

The base-plate is provided with four – 7/8” knock-
outs for both low & high voltage wiring entry to
the unit. The two – left side knock-outs are for the
low voltage compartment and the two – right side
knock-outs are for the high voltage entry(s). If a
larger entry hole is required, use a sheet metal hole
punch or other applicable method to produce the
proper hole diameter for the strain-relief or conduit
connection to be utilized. (See Figure 16)

Note: Bottom power base-plate is not designed to
support the weight of long conduit or wire runs or
installations using large gage wires. Always ensure
the conduits and wiring coming into the unit is
properly supported from the building structure and
not from the unit.

4. Replace bottom power base-plate with wiring

conduit or strain-relief and re-attach with the same
screws.

5. Install bottom power entry box on to base-plate and

attach with four – ½” long #10 screws (provided)
using a 5/16” nutdriver. (See Figure 2)