Reznor UDAP-CV with option AV6 Option - Installation - Common Vent User Manual
Page 8

Form I-UD-V-CV, P/N195677R5, Page 8
www.ReznorHVAC.com
(800) 695-1901
©2014 Reznor, LLC. All rights reserved.
Trademark Note: Reznor
®
, T-CORE
2®
, and V3
®
are registered in at least the United States.
0514 Form I-UD-V-CV (Version A.4)
3.0 SECTION 2 -
Requirements
and
Instructions
for Category
I Common
Venting of a
Model UDAP-
CV (cont’d)
3.5 SECTION 2 - Vent Terminal
The vent terminal should be a minimum of six feet (1.8M) from adjoining build-
ings. The vent terminal should be six inches (152mm) higher than the antici-
pated snow depth but no less than two feet (610mm) above the roof. Where
the vent extends through the roof, a clearance thimble is required when the
flue pipe extends through combustible materials; follow the requirements of the
double-wall pipe manufacturer.
Terminate with a Reznor Option CC1 vent cap.
3.6 SECTION 2 - Clearance to Combustibles
Maintain 6 inches (152 mm) clearance between a single-wall vent pipe and
combustibles.
For Type B double-wall vent pipe, follow the pipe manufacturer’s recommenda-
tions for clearance to combustibles.
- UDAP Unit Installation Manual (40 pages)
- UDBP Unit Installation Manual (44 pages)
- UEAS Unit Installation Manual (44 pages)
- VPS Unit Installation Manual (44 pages)
- VPT Unit Installation Manual (40 pages)
- VCS Unit Installation Manual (48 pages)
- CAUA Unit Installation Manual (44 pages)
- EEDU Unit Installation Manual (32 pages)
- LDAP Unit Installation Manual (44 pages)
- MASA Unit Installation Manual (40 pages)
- RDF Unit Installation Manual (28 pages)
- RPB Unit Installation Manual (40 pages)
- SC Duct Furnace Unit Installation Manual (40 pages)
- SSCBL Unit Installation Manual (60 pages)
- X Unit Installation Manual (32 pages)
- ZQYRA Unit Installation Manual (72 pages)
- ADF Unit Installation Manual (28 pages)
- F Unit Installation Manual (40 pages)
- PDH (Indoor PreevA) Unit Installation Manual (72 pages)
- MAPSIII Unit Installation Manual (76 pages)
- RDH (Outdoor PreevA) Unit Installation Manual (68 pages)
- RP (Outdoor Duct Furnaces) Unit Installation Manual (32 pages)
- YDHA Unit Installation Manual (76 pages)
- OH Unit Installation Manual (28 pages)
- RBL (Cabinet Blower) Unit Installation Manual (12 pages)
- REC (Evaporative Cooling) Unit Installation Manual (12 pages)
- RIHN Unit Installation Manual (20 pages)
- UDAP Option - Installation - Power Venting (12 pages)
- UDAS Option - Installation - Separated Combustion Venting (16 pages)
- WS Unit Installation Manual (15 pages)
- EBHB Option - Installation - Thermostat Kit (2 pages)
- EFMA Unit Installation Manual (27 pages)
- EWHB Unit Installation Manual (9 pages)
- EXUB Unit Installation Manual (16 pages)
- XAWS Unit Installation Manual (12 pages)
- XAWU Unit Installation Manual (12 pages)
- XBWU Unit Installation Manual (12 pages)
- MAPS III Option - Installation - Energy Recovery Module Installation (12 pages)
- UDAP in sizes 30 through 125 Option - Installation - Ceiling Suspension Kit (2 pages)
- UEAS Option - Installation - Downturn Nozzles - V3 (4 pages)
- UDBP Option - Installation - Polytube Adapter Instructions (4 pages)
- UDBS Option - Installation - Vertical Louvers - V3 Series (2 pages)
- B Option - Installation - Blower/Filter Cabinet (4 pages)
- PDH with 1-stage gas control or 2-stage gas control Gas Conversion Kit Instructions (8 pages)
- VP series infrared heaters High altitude conversion instructions (12 pages)