9.3 Hydraulic Plumbing

From this point on in the installation the booms will be inoperative until the hydraulics are
fully installed.

1. After the NORAC valve is mounted, the hydraulic hoses and fittings can be plumbed. The

plumbing for the hydraulic circuit is shown schematically in Figure 3.

2. The “raise” lines must be connected to the “B” ports of the NORAC valve block. Insert the

6FJXR-6MJT tee fittings (F02) to the Fast valve block on the “raise” lines. Connect the hoses
to the open ports on F02 and to the “B” ports of the NORAC block.

3. Tee in the pressure (“P”) and tank (“T”) lines for the NORAC block in to the existing lines

on the Fast valve block, using the 8FJXR-8MJT tee fitting (F03).

4. You must ensure there are no other orifices present in the circuit between the NORAC valve

block and the boom cylinders.