NORAC UC5-BC-FT02 User Manual
Page 23
![background image](/manuals/699745/23/background.png)
20
7.3 Input Module
1. Install the input module (E03) on the boom near the Fast valve block. Secure it to the boom
with cable ties.
2. Connect the free end of the CANbus cable (C02) from the valve module to the input module.
3. Connect the 12 pin connector on the tilt interface cable (C20) to the Thru 2 connector on the
side of the input module.
4. On the interface cable (C20), tee the “Left Up” to “Left” on the Fast valve block and “Right
Up” to “Right”.
5. Connect the unused male and female connectors on “Left Down” to each other and connect
the unused male and female connectors on “Right Down” to each other.
Figure 19: Input Module Connections
6. Connect the 12 pin connector on the main lift interface cable (C21) to the Thru 1 connector
on the side of the input module.
7. Insert the “Aux 2” tee between the Fast directional cartridge and the existing cable.
8. Insert the “Main Up” tee between the Fast “Main” function cartridge and the existing cable.
9. Connect the unused male and female connectors on “Main Down” to each other
10. If your sprayer has a bypass valve, insert the 2-pin tee connector marked “AUX 1” into the
bypass valve connection. If your sprayer does not have a bypass valve, connect the plug and
receptacle “Aux 1” connectors together.