beautypg.com

6 hydraulic installation, 1 valve mounting – NORAC UC4+BC+SM1 User Manual

Page 19

background image

16

4.6 H

YDRAULIC

I

NSTALLATION

If your valve block connectors appear
different than shown, see Appendix A for
more details.

WARNING!

The hydraulic system creates very high
pressure. Before disconnecting any
hydraulic lines ensure all pressure has
been bled from the system. When
changing the boom hydraulic hoses leave
the booms in TRANSPORT POSITION.

IMPORTANT:

Component failure due to oil
contamination is not covered under the
UC4+ System warranty. It is
recommended that a qualified technician
does the hydraulic installation.

4.6.1 Valve

Mounting

1. On a clean surface remove all plastic

plugs from the NORAC hydraulic Valve
(V01) (Figure 16).

2. Install the orifices (F05) into the "B"

ports with the notch facing outward as
shown in Figure 17. An O-ring pick can
be used to ease installing the orifices
into their locations.

Figure 16 – NORAC Valve Block

3. Install the 6MB-6MJ fittings (F02) into

the "B" ports and tighten to 18 ft-lbs.

4. Install the 6MBP plugs (F04) into the

"A" ports and tighten to 18 ft-lbs.

Figure 17 – Valve Block Assembly

NOTE
ORIENTATION
“B” LINE
ORIFICE