beautypg.com

NORAC UC4+BC+NT3 User Manual

Page 24

background image

21

5. There is an access hole located in the

front right corner of the cab floor that
can be seen when the floor mat is
lifted. Access plates (B16, B17 and
B18) which maintain the cab seal are
provided in the UC4+ kit. Rout C01
and C10 through the small hole and
large hole in the access plate (Figure

2 and Figure 20).

Leave the cover plates (B17 and

B18) unscrewed at this point.

Figure 20: Access plates

configurations

Figure 21: Valve Cable configurations

Outside of Cab

6. Connect the 6-pin shroud of the valve

extension cable (C04) to the 6-pin
tower of C10.

The valve extension cable (C04)

is packaged with one end not

installed. This is for installation
on other sprayer types. Install
the included connector as per the
drawing in Section 5.5. If you
make a mistake use the pin
pusher tool supplied to remove
the wires.

7. Route C01 and C04 to the front of the

sprayer, in the vicinity of the valve
block.

8. Connect the 6-pin tower on the valve

cable (C03) to the mating 6-pin shroud
on C04.

If your sprayer has the quick

disconnect option, also install the
valve disconnect cable (C11)
betweenC04 and C03.

9. Install the 2-pin connectors from C03

onto each NORAC valve as shown in
Figure 22.

10. The connectors on the valve cable

(C03) are marked RIGHT UP, LEFT
UP
, RIGHT DOWN and LEFT
DOWN
. Cables labeled with UP go
on the same side as the hydraulic hoses.

Figure 22: Valve Cable Connections