beautypg.com

2 valve mounting – NORAC UC4+BC+JD6 User Manual

Page 22

background image

19

10. Reinstall the plug and tighten to 35-40

in-lbs.

Figure 25: Load Sense Bleed Orifice

Location on Top of Block

4.6.2 Valve Mounting

1. Mount the NORAC valve (V01) on the

sprayer using the valve mounting

bracket (B10).

2. As shown in Figure 22, screw short

side of the threaded rods into the
bottom of the valve block at least 3/8".
The valve mounting holes are drilled and
tapped 3/8 NC-1" deep.

3. Tighten the Hex nuts to hold the rods.

4. Put the mounting bracket on the other

side of the tube and tighten with the

spring washers and the Hex nuts.

5. Cut excess off of the rods, if necessary.

If using bolts, the bolts should

thread into the valve block at
least 3/8". The valve mounting
holes are drilled and tapped 3/8
NC-1" deep. The rule of thumb
for bolt length is 1-1/2" longer
than the tube size.

You must ensure no hydraulic

components will interfere with
any sprayer parts or be pulled
tight at any time.

Figure 26: Valve Mounting Example

NORAC

Valve Block